- Waterfront Sub-area Plan – Highlights focusing on Industrial Use6.85 MBPreviewFebruary 20, 2024Downloads: 104
- Copy of Record DepartmentofEcology Tuesday December 5 2023170.75 KBPreviewDecember 7, 2023Downloads: 293
- Minnesota investigating air pollution at metal shredders around the state2.00 MBPreviewDecember 4, 2023Downloads: 299
"Shredding the scrap metal risks fouling the air with a range of pollutants, including particulate matter or soot, toxic volatile organic compounds (VOCs) and mercury."
- Smoke_complaints_cloud_neighborhood_near_New_Ulm_Steel_and_Recycling637.81 KBPreviewDecember 4, 2023Downloads: 305
The smoke cloud is not the first time NUSR has faced complaints from the
neighborhood. The recycling facility has received complaints going back
eight years. However, the original complaints were noise related. Several
neighbors reported explosions coming from the facility.
- Petition Signatures – Master3.81 MBPreviewOctober 3, 2023Downloads: 195
We are getting close to 500 petition signatures with incredibly sad stories of how the Metal Pile has effected the lives of these residents.
- Wastewater Violation – Port of Bellingham – Lead – 0401202363.50 KBPreviewOctober 1, 2023Downloads: 253
- Waterfront Sub-area Plan – Highlights focusing on Industrial Use6.85 MBPreviewFebruary 20, 2024Downloads: 104
- Copy of Record DepartmentofEcology Tuesday December 5 2023170.75 KBPreviewDecember 7, 2023Downloads: 293
- Minnesota investigating air pollution at metal shredders around the state2.00 MBPreviewDecember 4, 2023Downloads: 299
"Shredding the scrap metal risks fouling the air with a range of pollutants, including particulate matter or soot, toxic volatile organic compounds (VOCs) and mercury."
- Smoke_complaints_cloud_neighborhood_near_New_Ulm_Steel_and_Recycling637.81 KBPreviewDecember 4, 2023Downloads: 305
The smoke cloud is not the first time NUSR has faced complaints from the
neighborhood. The recycling facility has received complaints going back
eight years. However, the original complaints were noise related. Several
neighbors reported explosions coming from the facility.
- Petition Signatures – Master3.81 MBPreviewOctober 3, 2023Downloads: 195
We are getting close to 500 petition signatures with incredibly sad stories of how the Metal Pile has effected the lives of these residents.
- Wastewater Violation – Port of Bellingham – Lead – 0401202363.50 KBPreviewOctober 1, 2023Downloads: 253
- Air Monitoring – Port of Bellingham – ABC Recycling – Log Pond – April 26th 20231.17 MBPreviewSeptember 29, 2023Downloads: 320
- BC Metal Recycler fights provincial order to stop polluting874.72 KBPreviewSeptember 27, 2023Downloads: 244
- Employment – ABC Recycling – Shipping Terminal – Log Pond89.11 KBPreviewSeptember 27, 2023Downloads: 234
- Pacific Coast Longshore Contract – 2019 – 2022898.80 KBPreviewSeptember 27, 2023Downloads: 194
The 2023 - 2028 Contract is not yet public. It is not expected to change from the 2019-2022 contract in any substantive way in regard to the topic of the Bellingham Waterfront.
- EnvironmentalNoiseStudyReport-PortofBellinghamShippingTerminalNighttimeScrapMetalrev1.pdf3.27 MBPreviewSeptember 27, 2023Downloads: 185